Precipitation annual maximum series (inches) Station ID: 50-8882 Station name: SUSITNA State: AK Latitude (decimal degrees): 61.3333 Longitude (decimal degrees): -150.6667 Elevation (feet): 13 Duration: 1 day 06/28/1933 0.99 12/05/1934 1.57 10/02/1935 2.31 10/22/1936 2.09 09/15/1937 1.48 08/22/1938 0.97 10/06/1939 1.61 11/13/1940 1.71 12/31/1941 1.25 09/21/1942 3.01 09/07/1943 1.63 08/21/1944 1.30 08/12/1945 1.30 03/30/1946 1.37 Duration: 2 days 09/06/1933 1.85 12/04/1934 2.58 10/01/1935 3.42 10/21/1936 2.27 09/15/1937 2.24 06/17/1938 1.54 08/06/1939 2.11 11/12/1940 2.15 12/30/1941 1.50 09/21/1942 4.92 09/06/1943 2.03 09/07/1944 1.98 08/11/1945 2.40 03/30/1946 2.18 Duration: 3 days 09/06/1933 2.03 12/03/1934 3.21 09/30/1935 3.90 10/20/1936 2.76 09/14/1937 2.65 06/17/1938 2.13 08/06/1939 2.47 11/12/1940 2.22 12/30/1941 1.72 09/20/1942 5.68 09/05/1943 2.12 08/20/1944 2.16 08/10/1945 3.24 03/30/1946 2.29 Duration: 4 days 09/06/1933 2.16 12/03/1934 3.34 09/29/1935 4.44 10/22/1936 3.09 09/14/1937 2.76 06/17/1938 2.75 08/06/1939 2.73 11/13/1940 2.42 06/23/1941 1.93 09/19/1942 5.91 09/04/1943 3.21 08/21/1944 2.38 08/09/1945 3.64 03/30/1946 2.38 Duration: 7 days 08/18/1933 2.39 12/03/1934 3.95 09/26/1935 5.75 10/21/1936 5.27 09/10/1937 3.23 06/15/1938 3.17 08/26/1939 3.50 11/12/1940 4.04 06/22/1941 2.23 09/20/1942 6.86 09/02/1943 3.38 08/26/1944 3.66 08/09/1945 4.73 07/28/1946 2.72 Duration: 10 days 08/15/1933 2.68 08/21/1934 4.35 09/25/1935 6.19 10/20/1936 6.27 09/14/1937 3.59 06/12/1938 3.23 08/04/1939 4.12 11/12/1940 4.40 12/27/1941 2.30 09/17/1942 7.26 09/04/1943 3.82 08/31/1944 4.92 08/07/1945 5.79 08/12/1946 3.00 Duration: 20 days 08/20/1933 4.25 08/18/1934 7.91 09/25/1935 7.01 10/10/1936 9.17 09/08/1937 4.74 09/07/1938 4.17 08/04/1939 7.10 09/07/1940 6.03 06/22/1941 3.30 09/08/1942 8.33 08/20/1943 6.72 08/20/1944 9.55 08/06/1945 9.40 07/28/1946 4.94 Duration: 30 days 08/15/1933 5.15 08/09/1934 9.10 09/12/1935 7.44 10/10/1936 11.11 09/08/1937 7.13 08/31/1938 4.93 08/04/1939 10.61 09/02/1940 8.61 06/22/1941 4.03 08/30/1942 10.65 08/09/1943 8.63 08/20/1944 11.70 08/08/1945 10.39 07/28/1946 6.09 Duration: 45 days 08/03/1933 7.30 07/26/1934 10.38 08/26/1935 9.53 09/25/1936 13.28 09/09/1937 8.26 08/16/1938 6.88 07/30/1939 13.27 08/29/1940 10.35 06/22/1941 5.76 08/15/1942 12.97 08/20/1943 10.98 08/01/1944 13.20 07/17/1945 11.79 07/28/1946 6.60 Duration: 60 days 08/03/1933 8.60 08/12/1934 12.17 09/25/1935 11.01 10/02/1936 15.13 08/15/1937 10.90 08/10/1938 8.05 08/04/1939 15.92 08/15/1940 11.88 06/05/1941 6.40 08/02/1942 15.03 07/31/1943 13.51 07/23/1944 14.84 08/08/1945 15.52 07/20/1946 7.61